Why is the Mill Building Different?

Gains:

  • Can count the special requirements of mill building
  • Establishes the relationship between floor height and load decisions and the process
  • Knows the consequences of building-process incompatibility

The mill building is not a warehouse. The process operates with vertical flow: material is carried up, coming down by gravity. The building is therefore part of the process itself.

decisive decisions

  • Number of floors and floor height: plansifter suspension space, feed pipe above the roller and maintenance access determine this.
  • Slab load: plansifter generates dynamic load; The static calculation should also include vibration.
  • Column axes: machine layout should be planned according to the machine layout, not the columns.
  • Mounting spaces and lifting points: the machine will change one day.
  • Ventilation and separation against the risk of dust explosion.

The price of noncompliance

If the building is built before the process is clarified, attempts are made to fit the machine into the building later. In this case, either capacity is reduced or maintenance access is sacrificed. Both are permanent damage.

The order is: process → flowchart → layout → building. If the building was built first, the process is redesigned according to that building; this is more expensive than designing from scratch.